Timberborn
PC
Mac
Simulator, Strategy, Indie
Humans are long gone. In a world struck by droughts and toxic waste, will your lumberpunk beavers do any better? Timberborn is a sandbox city-building game featuring ingenious animals, vertical architecture, water physics, and terraforming. Contains high amounts of wood.
Note de la critique
1 votes
Note des utilisateurs IGDB
18 votes
Date de sortie
12/03/2026
Genres
Simulator, Strategy, Indie
Vue joueur
Bird view / Isometric
Thèmes
Survival, Sandbox
Modes de jeu
Single player
Moteurs de jeu
Unity
Développeur
Mechanistry
Éditeur
Mechanistry
Liens